AlterStudio Architects | 6300 square feet | Completion May 2024
In my role as Project Manager for Rauser Construction, I took over this four level, long, sprawling project at the beginning of framing. It was a fun one, with very unforgiving details and alignments. The large amount of floor-to-ceiling site-glazed windows presented some challenges - constructability-wise, schedule-wise, and budget-wise. By AlterStudio’s design details, alignments of the exterior EIFS soffits and interior Level 5 ceilings were within 1/4”. An out-of-level slab also presented horizontal alignment challenges at the floors and at the ceilings. Really every material, transition and detail required a high degree of attention to alignments.